Monday, November 3, 2014

REASSEMBLY OF THE 1979 FORD MUSTANG CONTINUES


DRIVER'S SIDE TORQUE BOX WAS IN SAD SHAPE.
Sometimes you need to give a little TLC with a slide hammer. lol
Next was to weld in my 1/8th inch reinforcement plate




 I also had to fix some fuel line issues. I am running a new fuel line in front portion of car.
 There was a Zip tie to assist clip here before and I could see why that clip does not hold the fuel line well anymore.

 Coated with copper weldable primer in areas to be welded on again. Rear of sub frame connector will be welded to this contact point. Fuel line work will continue after Steeda full length sub frame connector is welded in on driver's side.



No comments: